The lifting mechanism of the electromagnetic bridge crane adopts the classic parallel axis arrangement, the trolley running mechanism adopts the low-speed shaft centralized driving structure, and the trolley running adopts the structure of independent driving on both sides.
[CODE_4]: MEDIA_ELEMENT_ERROR: Format error





