Semua kategori
Kategori terpilih
Trade Assurance
Pusat Pembeli
Pusat Bantuan
Unduh aplikasinya
Jadi supplier

Removable Customized Expressway Construction Tunnel Formwork System

Belum ada ulasan
[CODE_4]: MEDIA_ELEMENT_ERROR: Format error
Removable Customized Expressway Construction Tunnel Formwork System
Removable Customized Expressway Construction Tunnel Formwork System
Removable Customized Expressway Construction Tunnel Formwork System
Removable Customized Expressway Construction Tunnel Formwork System
Removable Customized Expressway Construction Tunnel Formwork System
Removable Customized Expressway Construction Tunnel Formwork System

Atribut produk

Spesifikasi industri

After-sale Service
Online technical support, Onsite Installation, Onsite Training, Onsite Inspection
Project Solution Capability
graphic design, 3D model design, total solution for projects, Cross Categories Consolidation
Application
concrete formwork
Design Style
Traditional

Atribut lainnya

Material
Stainless Steel
Feature
Reusable
Place of Origin
Tianjin, China
Type
Garis terowongan trolly
Warranty
1 Year
Brand Name
Jinchen Zhihui
Lokasi asal
Tianjin, Tiongkok
Tipe
Dapat didaur ulang
Nama merek
Jinchen Zhihui
Nama
Troli berlapis terowongan
Aplikasi
Bangunan terowongan
Nama produk
Garis terowongan bekisting
Warna
Persyaratan pelanggan
MOQ
50 ton
Toleransi
Standar atau sesuai dengan kebutuhan Anda
Ukuran
Gambar proyek

Estimasi waktu

Deskripsi produk

Related Products
Tunnel lining trolley
Pier formwork
Self-propelled invert trestle
T-type beam formwork
Cast-in-place Beam
Cantilever form traveler
Tunnel layer distributor
Cantilever form traveler
Precast segmental box girder
Products Description
Hydraulic tunnel lining trolley
The trolley developed by Jinchen Zhihui which is concentrated on commonality, humanity construction. Structure reliable, convenient operation, good tunnel surface etc. The trolley widely used in highway, railway, water projects, hydraulic engineering, public projects, and defense industry projects.The tunnel trolley which consist of formwork assembly, traveling device, portal-frame assembly, Principal and master-slave traveling device, lateral hydraulic oil cylinder, lateral support jack and portal-frame support jack etc.
1、Heavy-duty tunnel formwork system for construction of subway stations, road or train tunnels and hydraulic galleries
2、Equipment for lining tunnels. Self-supporting formwork that is moved using hydraulically driven carriages.
Our Advantages
1. Reliable structural design: The structure is stable and has strong load-bearing capacity, ensuring that the trolley can operate effectively in complex and changing construction environments. 2. Humanized construction design: The humanized design of the trolley makes it easy to operate and can save manpower, material resources, and financial resources to the fullest extent. 3. Good tunnel forming surface: The structural design of the side-top arch trolley can ensure the quality and stable forming of the tunnel forming surface, laying a strong foundation for future construction.
Product packaging

Packing:

1.Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2.Different packages are used for different products:
---Bundles:Timber beam, steel props, tie rod, etc.
---Pallet:Small parts will be put in bags and then on pallets.
---Wooden cases:It is available on customer's request.
---Bulk:Some irregular goods will be loaded in bulk in container.

Delivery:

1.Production: For full container, normally we need 20-30 days after receive customer's down payment.
2.Transportation: It depends on the destination charge port.
3.Negotiation is needed for special requirements.
Company Profile
Jinchen Zhihui (Tianjin) Equipment Manufacturing Co., Ltd. set equipment manufacturing, research and development, design, production and sales as one of the automated factory. The company is located in the national development zone (Tianjin Beichen high-end Equipment Park), the company covers a total area of 60 acres, production workshop 25000 square meters, office building 3000 square meters, R & D building 2000 square meters, dormitory building 2000 square meters, the company has advanced 30000 watts automatic laser cutting machine, There are more than 80 sets of international first-class intelligent high-end equipment such as large plate rolling machine, bending machine, combined punching and shearing machine, intelligent programming robot, and the annual production capacity reaches 70,000 tons. Our company is committed to the design, development and manufacturing of supporting equipment for high-speed rail, subway, expressway, wind power generation, offshore oil and other industries. The main products are intelligent beam field, tunnel lining trolley, intelligent hydraulic prefabricated beam production line, steel trestle, steel pipe column, shield starting frame, shield steel ring, and I-steel for ground wall. Tunnel cable support, lattice column, subway steel support, bridge steel module, metro light rail steel template, high-speed rail special steel template, pipe gallery plane steel mold, wind turbine machine bin components, wind power equipment transport support, fan blade mold, etc. Jinchen Zhihui is based on advanced technology, the implementation of modern production, large-scale management, to create energy saving, environmental protection, high efficiency, high precision, high quality of modern smart factory.
Jinhen Zhihui with advanced technology, excellent quality, satisfactory service, to provide the best solutions for customers across the country, sincerely look forward to cooperation with friends from all walks of life, hand in hand, create a better future.
Manufacturing Technique
Customer Photos
FAQ
Q1:Are you trading company or manufacturer?
A:We are factory.

Q2:What services can we provide?
Accepted Delivery Terms: FOB,CFR,CIF,EXW,CIP,DDU,Express Delivery;
Accepted Payment Currency:USD,EUR,CNY;
Accepted Payment Type: T/T,L/C,Credit Card;
Language Spoken:English,Chinese

Q3:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q4:How can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment;

Q5:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
C:We provide remote or on-site instruction to the builders.


Q6:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.

Q7:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Q8:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

2 - 49 Ton
Rp 23.303.446
50 - 99 Ton
Rp 19.974.382
>= 100 Ton
Rp 16.628.673

Variasi

Pilihan:1 Color.
Pilih sekarang

Color(1)

Customer Requirements

Jasa pengiriman

Biaya ongkir dan jadwal pengiriman bisa dinegoisasikan. Hubungi supplier untuk lebih lanjut

Perlindungan produk

Pembayaran aman

Transaksi Anda di Cooig.com dilindungi dengan enkripsi SSL yang ketat dan protokol keamanan data PCI DSS.

Kebijakan pengembalian dana & Easy Return

Klaim pengembalian dana jika pesanan Anda tidak terkirim, hilang, atau tiba dengan masalah produk, ditambah pengembalian lokal gratis untuk produk cacat

Hubungi Supplier
Chat Sekarang
survei